期刊问答网 论文发表 期刊发表 期刊问答
  • 回答数

    2

  • 浏览数

    217

liangtang528
首页 > 期刊问答网 > 期刊问答 > 钻孔灌注桩论文摘要

2个回答 默认排序1
  • 默认排序
  • 按时间排序

Z你好

已采纳
Abstract Lankao from Lianhuo highway expansion project to the Liu Jiang Section 17 million mark in highway overpass separate pile-point start instance, analyzes the pile construction should be noted, as well as supervision of the construction process and quality elements that should be Note that the issues in order to ensure the quality and Geology in the sand with a bridge, the use of bored piles, the design pile length is 22 meters, with four piers, and a pier four, the foundation construction is difficult, the quality factors of instability and more Control the pile foundation should focus on positioning, and socketed into the rock to determine the depth, sediment thickness, concrete placing, construction of pile top elevation, and other Keywords: pile foundation; construction and supervision

钻孔灌注桩论文摘要

354 评论(15)

nicolas

From connect Huo superhighway the orchid test into Liu Jiang Duan to change to extend engineering the number 17 marks ten thousand high way hole tax disconnect the stake cardinal points type in type interchange start work a solid instance to set out, analysis stake the radicle is under construction to note of question, and superintendency vs construction the process flow and mass main should note of question to ensure the mass and progress of The bridge is placed in sandy soil geology tape, the adoption drilling infuses to note a stake, design stake lengthways for 22 meters, there are four Dun stands, and be four for one Dun, starting construction because of this radicle the difficulty is big, mass unsteady factor poly -, have high Should particularly control a good stake radicle clamping, go into a rock judgement and Qian rock depth, sink dirt thickness and Mao to infuse to note, stake the vertex elevation each construction of Keyword: Stake foundation;Start construction with Jian
169 评论(8)

相关问答