期刊问答网 论文发表 期刊发表 期刊问答
  • 回答数

    5

  • 浏览数

    283

这是个圈套
首页 > 期刊问答网 > 期刊问答 > 建筑电气设计论文摘要

5个回答 默认排序1
  • 默认排序
  • 按时间排序

我去嗯哼哼

已采纳
买论文,或者上网搜上篇,这是最简单的办法

建筑电气设计论文摘要

115 评论(11)

蟹老板

如果你有一点英语基础的话,只需要把摘要在线翻译,在稍微编排就可以了。有一个问题,毕业论文的摘要需要这么长吗?摘要需要简要明了即可呀。
114 评论(12)

yonglin-65

Abstract: At the conclusion of design experience, combined in civil construction in the electrical design issues frequently encountered by the paper on the main hospital building in the electrical design of the following questions: 1, through different forms of wiring fault occurred when the current flowing through the human body, discussed the use of the operating room for patients isolated power system provides a reliable security The isolation and detailed description of the composition of power supply system 2, a more detailed exposition of the various functional integrated ward floor area electrical design 3, by the nature of lightning current, lightning current distribution, in line with the state of existing norms mine classification of the building from the proposed mine measures four aspects are the main anti-lightning directly stroke, mine electric sensors, mine waves penetrated and anti-magnetic pulse 4, in order to effectively reduce human exposure voltage, and can effectively eliminate foreign economic relations since the building of electrical lines and metal pipes into buildings dangerous fault voltage hazards, such as potential connection to further protect the buildings used electrical
95 评论(10)

809309547ye

关键字、摘要,主要的观点或者论调。下面英文翻译一遍上面的。也可以不要。
212 评论(12)

jane2004

The graduation to the design plan, based on the principle of national economic development, policies, technical requirements criteria, combined with the actual construction to ensure reliable power supply, scheduling flexibility to meet the technical In the analysis of raw data based on the 110KV substation electrical design engineering on several comparative analysis of the connection modes of operation, first elected to meet the 110KV substation safe, reliable quality, following the security requirements of economic operation and the best connection mode as normal 110KV substation run main electrical On the development of the main electrical connection, to short-circuit current calculation, to choose a reasonable electrical Finally, a part of the wiring and the configuration of relay protection requirements to ensure safe and economic operation of the substation to prevent the occurrence or expansion, to the purpose of safe and economic Substation automation is the secondary substation equipment (including measuring instruments, signal systems, relay protection, automatic devices and remote devices, ) through a combination of functions and optimize the design, use of advanced computer technology, modern electronic technology, communication technology and signal processing technology, on all major substation equipment and transmission and distribution lines of automatic monitoring, measurement, automatic control and computer protection, and integrated communications and scheduling automation
253 评论(8)

相关问答