With the deepening reform of the construction industry management system, engineering project construction management is becoming more and more attention to it, the management level has become the first factor in restricting the survival and development of enterprises, and the quality, schedule, cost control is the most important for the management of key The construction site in the center of the city, the main road around for public housing This project is a comprehensive commercial building Total construction area 29m2, including the underground construction area of 4 m2, and the ground is 89m2, On the ground 17, underground 2 layer, building a total height of 5 The main body for the frame shear wall structure, the base of natural raft Keywords: construction organization design, frame structure, comprehensive building

土木工程论文翻译器

307 评论(8)

512360762

这个要靠你自己找了,你可以上万方网找,还有那也可以找的但你们学校必须买那样的数据库
164 评论(9)

MIT_imissyou

非专业人士翻译,仅供参考,其中某些专业术语不敢保证一定准确Building projects implementation management has drew an accenting concentration since the beginning of a further management system reform in construction The management level, which inconsists of construction quality, construction progress and cost control as topissues to handle, has become a premier essence to decide prospect of a The projectconstruction site is located on the city centre, where the main traffic lanes aresurrounded by This project is a seventeen floors complex building of2 basements for commercial purposes construction project, construction area is 16,29M2, which comprises theunder ground area 3,4M2and the above ground area 13,89M2, the total height reaches 5M The main building is a frame-shearwall structure with natural raft Keywords: ConstructionPlot, Frame-Shear Wall Structure, Complex B
82 评论(12)

2363543

With the deepening reform of the construction industry management system, engineering project construction management is becoming more and more attention to it, the management level has become the first factor in restricting the survival and development of enterprises, and the quality, schedule, cost control is the most important for the management of key The construction site in the center of the city, the main road around for public housing This project is a comprehensive commercial building Total construction area of 29m2, including the underground construction area of 4 m2, 89m2, on the ground, On the ground 17, underground 2 layer, building a total height of 5 The main body for the frame shear wall structure, the base of natural raft Keywords: construction organization design, frame shear wall structure, comprehensive building