Is longest in the clothing enterprise production cycle, the labor force uses many sews the workshop, the value production main dependence labor force individual absolute work ability, in addition industrialization assembly line division of labor coordination production method, also falls the foot to the work value two excavations on the necessity to the labor force work coordination, to sews the craft to carry on the optimization is we carries on the production to the clothing enterprise to reform the most important This paper carries on the analysis to Kangli the clothing factory existing plan, for solves this factory to sew the workshop labor efficiency somewhat low question, diagnosis this enterprise production line work time has discovered the craft which some unreasonable needs to improve, then the utilization corresponding method carries on the optimization, the paper mainly from the workshop arrangement, the working procedure arrangement, the assembly line and so on three aspects carries on the analysis In view of the question proposed corresponds the optimized method, enhances the production efficiency, the reduced nonessential At the same time, the paper some unreasonable phenomenon carries on the analysis to the workshop in, and proposes the solution