期刊问答网 论文发表 期刊发表 期刊问答
  • 回答数

    3

  • 浏览数

    349

知否知否
首页 > 期刊问答网 > 期刊问答 > 铁路信号方面的论文英语翻译题目

3个回答 默认排序1
  • 默认排序
  • 按时间排序

chinalgq

已采纳
Summary With the development of railway technology , train speed and its carrying capacity hvae great increased ,High requirement of safeguarding of train movement is proposed in order to ensure train safety and its open and There are many technologial means of ensuring normal train movement, among which ,track circuit is one of the most important (1**), ZPW-2000 ,as a non-insulation frequency shift automatic block system ,is by far the most advanced non- insulation automatic block one (2** It will exert role in technique development policy in our railway where cab signaling is proposed as the main running HeFei- NanJing High-speed Railway is an important part of our country' s expressway net which is the first passenger rail line in our country This paper mainly and systematically demonstrates composition and principle of ZPW- 2000 non-insulation track circuit system and simply explains the knowledge about (a) (3**)equipment layout of each equipment cabinet in region, (b) zero-layer wire running and so on This design is based on the design specifications in railway signalling together with the specific circumstance of MaChang railway Automatic block and the turnout N18 are used in the station to meet the requirement of picking up train speed The aim of this engineer design is ,by studying and then mastering AUTO CAD , to (A)(4**)accomplish the engineering drawing of MaChang station in HeFei- NanJing line, including (a) the layout drawing of station and railway section signals ,(b)indoor equipment layout ,(c)track circuit diagram of the station and the railway section ,(d)signal display and coding order schedule, and (e) layout and wiring diagrams to each equipment cabinet,and to(B) (5**)be able to master (a)how to change the collection of the directional relay in station and train section,(b)driver design,and (c) how to make a calculation and configuration of the compensation capacitor In this paper, we first introduce the development situation and research significance of frequency shift automatic block at home and abroad ;secondly expound the engineering design from the whole to the local combining with the design drawing, and determine the overall design program combining with the layout plan of the station and train section ; then make a general layout of the whole indoor equipments ; and then design the structure and function of the track circuit in train sections and instation ; and finally give a simple explanation of wiring layout of each equipment 注释:(1** ----5**)是语法结构的联系(有省略,有指代词,有并列等), (a, b, c, d ),等是并列语法成分的联系符号,如果能够看懂,就把这些所有括号内的字母或数字符号去掉不看而直接根据原文的结构正确理解即可,即完全不需要上述的提示。

铁路信号方面的论文英语翻译题目

196 评论(9)

雅宁

1一个小的哲学2基本概念3数学建模 4信号与系统 5连续时间和离散时间信号和系统 6组织材料
237 评论(10)

xiaoqiqua

Level 2 - CTCS list control system is based on the rail transport information of train running speed control system, using high-speed lines and new car - land and integrated Level 2 - CTCS applicable section of speed, the ground not set by the signal, the crew by car It is based on the point of track circuit, to train operation control information transmission system of point - Level 2 - CTCS of system control center and control station and interval track circuit and send by trackside electronic control unit (LEU, active response to achieve continuous transmission of information control This topic research using the computer simulating microcomputer interlocking system monitoring station, and the relevant information chain system microcomputer control center and the data table automatically generate into This system to list the automatic control center data analysis, the DianMaHua frequency configuration chart every, data For response to the on-board equipment is ready for data Paper mainly includes introduction, basic function and the technical index system, the overall structure and the software design, computer interlocking system simulation analysis and design of monitoring, Numbers, car into information analysis and design, the response of the device Numbers information analysis and design, line speed information analysis and design, orbit segments of information analysis and design of a few parts, One of the main parts in the introduction of the system and the background of the current situation, the study shows, Then describes the system technical indicators and basic functions, And according to the technical indicators and basic functions of the system is put forward for total structure, system design and analysis of the main principle illustrated, According to the specific requirements of the system, the overall design of the system software, and finally to system interface design as necessary
200 评论(13)

相关问答