Abstract: the right side of the surface mount tungsten mineralization marks and pitting engineering deposit based on the investigation of geological structure, tectonic stress field method as the main research method, through the tectonic stress field of research and simulation of deep may occur is east forecast for the industrial orebody, regional further ore-prospecting work provide 希望对你有所帮助