The Yeji to the Xinyang highway construction organization plan and the construction drawing budget, the beginning is K31+5, the end point is K46+5, the total length 5 This design budgets two parts including the construction organization plan and the construction The construction organization plan included the establishment to rest on, the scope, the principle and the project survey; The determination construction general goals, have analyzed the construction general arrangement content; Elaborated the construction preparation primary coverage; Explained special sub-item project the specifically and so on subgrade treatment, roadbed reclamation, pavement structure, arch of bridge, draining water, protection construction crafts and the plan; Introduced this project quality, the time, the safe safeguard measure in detail; Civilized construction and environmental protection measure; Also separately to the rainy season, the winter, at night and so on special construction's technical measure did introduced that and has arranged the related engineering project progress The construction drawing budget part, the basis country present highway engineering related technical standard, the standard, the regulations and the law, the laws and regulations document, as well as the Henan Province highway engineering construction cost instruction information and so on carries on the Mainly established the budget to collect the master list, the overall budget artificially, the primary materials, mechanical stage class quantity to collect the master list, the construction and installation engineering cost computation chart and so Through the science computation step, calculates this project finally the final budgetary price, this project total construction cost is 00 Yuan key word: Road budget construction organization
AbstractYe set to Xinyang highway construction design and construction budget plans, the starting point is K31 +5, the end is K46 +5, chief of 5 The design includes construction design and construction budget plans in two Construction of organizational design, including the foundation, scope, principles and project profiles; determine overall objectives of the construction, construction of the overall layout of the content on preparations for the construction of the main elements; specify a special roadbed processing, filling roadbed, the road structure, Bridges and culverts, drainage, protection sub-projects of construction technology and programmes; details on the quality of the works, period, security assurances; civilization construction and environmental protection measures also the rainy season, winter, at night, and other special construction techniques Measures are introduced, and had been scheduled for projects related to the progress of Construction of part of the budget plans, based on the existing national highway projects on technical standards, norms, a point of order and the laws, regulations, documents and Henan Highway project cost guidance and other information Main summary of the budget preparation, with a total budget of the main material, Jixietaiban number matrix, construction and installation works, such as computation of Through scientific calculation steps, eventually worked out the final budget of the project price, the total project cost of 00 yuanKey words: Highway Construction budget参考